4 User interface
Name
SAK
Alarm history visualisation (read only)
SrG
Regulation sensor (read only)
St
Temperature control setpoint
StH
Humidity control setpoint
(a)
The menu where the parameter is situated is indicated in this column.
4.4
To set up for multiple units
4.4.1
To set the shared functions for multiple
units
Lights
Lights can be connected to all controllers in the network and the light
status is always synchronised. Each controller will turn the lights on
and off simultaneously.
The time during which the light stays on after opening and closing
the door is set by parameter H14, and can be set from 0 to
240 minutes. See "4.3.2 To change the parameters" [ 4 10].
Door open
The door microswitch must be connected to the primary unit
controller in the network. Door status is "open" if the switch is open.
As for the lights, also the door status is shared to all controllers.
Every controller knows if the door(s) is/are open or not, and each
controller can perform the actions that are set in parameters "DIE",
"DIP", "rIE" and "rIP".
Network temperature regulation
The temperature regulation can be performed in two ways
depending on the parameter "nrt" with the following values:
▪ 0: The relative controller regulates through the probe connected to
itself.
▪ 1: The relative controller regulates through the probe connected to
the primary unit controller.
The
network
logic
allows
compressors. Using the "SSd" parameter it is possible to set a delay
between starts of different LMSEY units.
If it is necessary to start several units at the same time, the first unit
to signal to start will be the first one to start. After "SSd" the next unit
will also start and so on (See the example below).
1
C1
0
1
C2
0
1
C3
0
1
0
1
0
SSd SSd SSd SSd
Operation manual
12
Description
avoiding
simultaneous
starts
A
C4
CM
sec.
SSd
Default
E6
0
50/
122
90
1
On
0
Off
A
Compressor status
B
Request status
C1
Compressor secondary unit 1
C2
Compressor secondary unit 2
C3
Compressor secondary unit 3
C4
Compressor secondary unit 4
CM
Compressor primary unit
SSd
Delay between start up [s]
Note: LMSEY2A19+25AYE01 units have two compressors, but work
in a similar way.
Network defrost
It is possible to enable/disable this functionality for each controller
separately.
Defrost can be synchronised between the primary unit controller and
secondary unit controllers using parameters dS_1, dS_2, dS_3, and
dS_4 with the following values:
▪ 0: No synchronisation performed.
▪ 1: Only starting.
Only starting: secondary unit controllers will start to defrost at the
same time as the primary unit controller, and all controllers can
finish in different moments.
▪ 2: Start & Stop.
Start & Stop: secondary unit controllers will start to defrost at the
same time as the primary unit controller. If one controller ends
defrosting before the others, the corresponding defrost relay is de-
energised and the dripping phase will only start when all other
of
controllers have finished the defrosting phase.
dS_1 = 0
dS_2 = 1
dS_3 = 2
dS_4 = 2
d2
= 0
CM
B
A1
C1
B1
C2
C3
C4
A
B
Min.
Max.
UoM
0
0
0
0
°C/°F
r1
r2
°C/°F
0.0
100.0
%
dS_1 = 0
dS_2 = 1
dS_3 = 2
dS_4 = 2
d2
= 1
B1
CM
A1
C1
B1
C2
C3
C4
min.
B
A
LMSEY1A09/13 + LMSEY2A19/25
4P728169-1B – 2023.07
(a)
Menu
●
dir
●
dir
●
CtL
●
CtL
B
min.
Daikin LMS