3. ELECTRICAL CONNECTION
3.1 WARNING
The connection to the electrical power supply system
must be carried out according to the current local regula-
tions.
Before connecting the appliance, make sure that the volt-
age and the frequency correspond to those stated on the
data plate of the appliance.
The appliance must be placed in such a way that the con-
necting plug to the network can be easily reached.
Place an omni-polar switch between the appliance and
the network in such a way that it will be easily accessi-
ble after the installation. The contacts of this switch must
have a minimum opening distance of 3 mm and the switch
must have an appropriate input (for example: thermal-
magnetic switch).
The use of a safety switch for fault current is suggested.
When the appliance is working, the power supply voltage
must not diverge from the value of the nominal voltage,
indicated on the data plate, by more than ± 10%.
3.2 CONNECTION TO THE ELECTRICAL SUPPLY
MAINS
It is sufficient to plug in the equipment to the appropriate
outlet (the outlet must be suitable to the issued plug).
The replacement of the cable must be done by author-
ised personnel.
The appliance must be connected to the ground line of
the network.
3.3 EQUIPOTENTIAL CONNECTION
The appliance must be included in an equipotential system
whose efficiency must be properly checked according to
the current laws. This connection must be done between
different appliances through the terminal marked with
the symbol: simbolo morsetto equipotenziale
The equipotential conductor must have a minimum sec-
tion of 10 mm2.
4. DRAIN CONNECTION
4.1 WATER DRAIN
You find the waste outlet pipe on the rear of the blast
chiller. It has to be connected to an open tundish drain
in compliance with current regulations through a rigid or
flexible pipe; the diameter of the pipe cannot be smaller
than diameter of the drain connection. The length of the
pipe cannot be longer than one metre.
Avoid reductions in diameter and tight bends along the
whole length of the waste pipe run.
The waste pipe must remain at least 20 cm below the
drain connection to allow the liquids to drain.
5. CONNECTION TO THE OVEN
The oven control board also manages the blast chiller.
The blast chiller XK304 is connected to the oven through
the RJ45 connectors that are located at the rear of the
oven.
To connect the cable from the blast chiller to the oven
proceed as follows:
•
Disconnect both the oven and the blast chiller from
the power supply
•
remove the safety cap by unscrewing the screw
•
Insert the connector of the cable in one of the three
female connections on the power card (you can use
any of them)
•
Replace the safety cap by fixing the screw
Check that the blast chiller is properly connected and
recognised by the oven control board by touching the
button until the display panel 4 shows number "4".
UNO X
R
ENGLISH
8