Vision Fitness T80 Manual Del Propietário página 26

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

ASSEMBLY STEP 4
HARDWARE FOR STEP 4:
ARC
SPRING
WASHER (E)
WASHER (B)
8.4 mm
8.2 mm
Qty: 6
Qty: 6
CONSOLE
MAST
MAST COVERS
SCREWS (G)
SUPPORT BAR CAP
BOLT (A)
SCREW (G)
20 mm
12 mm
Qty: 6
Qty: 8
CONSOLE BASE
CONSOLE CABLES
BOLTS (A)
SPRING WASHERS (B)
ARC WASHERS (E)
Open HARDWARE FOR STEP 4.
A
Gently place CONSOLE BASE on top of
B
CONSOLE MASTS.
NOTE: Be careful not to pinch the console
cables while attaching the console base.
Connect the CONSOLE CABLES and tuck
C
them inside the CONSOLE MASTS and slide
CONSOLE BASE into CONSOLE MASTS.
Connect the CONSOLE BASE to CONSOLE
D
MASTS using 6 ARC WASHERS (E),
6 SPRING WASHERS (B) and 6 BOLTS (A).
NOTE: Tighten all bolts from STEPS 1–3.
Attach MAST COVERS to BASE FRAME
E
using 4 SCREWS (G).
Insert SUPPORT BAR CAP into bottom of
F
SUPPORT BAR.
Repeat on other side.
G
27

Publicidad

Tabla de contenido
loading

Tabla de contenido