Fan coil with valve
Air temperature dry bulb (°C)
21
23
40
5
5
50
5
5
60
5
5
Relative
humidity %
70
5
5
80
5
6
90
6
8
If the valves are not installed, there could be abundant con-
densation, especially if the unit is not operated for long pe-
riods of time.
During wintertime periods of quiescence, drain water from the
system, to prevent ice from forming. If anti-freeze solutions are
used, check for their freezing point using the table below.
Freezing
% Glycol by weight
temperature (°C)
0
0
10
-4
20
-10
30
-16
40
-24
Electrical connections
Make the electrical connections whilst the power supply is
disconnected, in accordance with current safety regulations,
carefully following the wiring diagram and its legend.
Check that the mains electricity supply is compatible with the
voltage shown on the unit rating plate.
The electrical connections indicated must be made by the
installer.
For each fan coil a switch (IL) should be mounted on the power
supply, with opening contacts at a distance of at least 3 mm and
a suitable protection fuse (F).
For the electrical connections of the controls, follow the dia-
grams in the figures from: p. 105.
A
WARNING:
The power supply to the pump-float switch de-
vice must never be interrupted.
Control dedicated (FWEC10 - FWECSA - FWEC3A)
Controls implement a logic that makes it possible to set a fixed
speed shown in the figure with analog signal 3, 6, 8 V or automat-
ic speed modulation, that takes full advantage of the EC motor.
The automatic logic varies the analog signal to the motor be-
tween 2 and 10 V, based on the distance from the set-point, in
order to accelerate the implementation phases and then settle
at a very low holding speed.
» Cooling
25
27
29
31
33
5
5
5
5
5
5
5
5
6
8
5
5
7
9
11
6
8
9
11
13
8
10
12
14
16
10
12
14
16
18
Capacity
Pressure drop
adjustment
adjustment
1,00
1,00
0,97
1,05
0,92
1,10
0,87
1,15
0,82
1,20
» Heating
Hydraulic connections
Unit
FWI02ATN, FWI03ATN, FWI-
04ATN (2 pipes)
FWI06ATN, FWI07ATN, FWI-
08ATN (2 pipes)
Cooling
FWI02AFN, FWI04AFN (4
1/2'' gas F
pipes)
FWI06AFN, FWI08AFN (4
3/4'' gas F
pipes)
To optimise performance, it is advisable to make the following
connections on the exchanger:
Ū Unit outlet: connection below.
Ū Unit return: connection above.
B
WARNING: While making the connections, hold the water
connections of the unit tightly in place with a hexagonal
wrench or make sure that they do not rotate, in order to pre-
vent the pipes inside the unit from being damaged.
Ū Carefully insulate the inlet and outlet water pipes as well as
the devices installed in the network (on/off valves...). Use a
material that is suitable for the operating conditions and wa-
ter temperature.
Ū Bleed air from the exchanger by means of the air vent valves
located next to the water connections of the coil. Depending
on the installation, it may be necessary to place other vent
valves on the hydraulic system.
Condensate drain connection
Connect a rigid PVC pipe to the end of the hose and secure it
with a clamp
Correctly insulate the pipe with polyethylene foam.
Ū Be careful of the risk of freezing in winter in suspended ceil-
ings.
Ū If necessary, the condensate pipe can be routed immediately
after the unit's outlet. Maximum height: 900 mm (FIGURE 1).
Ū Make sure that the drainpipe has a slight slope in the
Exchanger connection
1/2'' gas F