Truma SecuMotion Instrucciones De Uso página 16

Ocultar thumbs Ver también para SecuMotion:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 49
– Open all stop valves.
– Remove the first heating unit
from the line and close the line
temporarily.
– Bring the gas system into
operation (see "Operating
instructions").
– Open the temporary seal. Gas
may flow out for only a short
time before the gas-flow
monitor is triggered.
– Screw the heating unit onto
the gas line.
– If you have more than one
heating unit, you must per-
form the test separately for
each one!
– Conduct the leak test (see
"Checking the low pressure
area for leaks").
16
Accessories
High pressure hoses
(with hose-break safety device)
see page 58 – 59
1.5 meter connection hose
for the connection of external
gas cylinders
– connection G.5 for Germany –
(part no. 50020-61300)
Replacement gaskets
for high-pressure connection,
M20 x 1.5 (G.13);
(part no. 50020-76300)
DuoComfort
Changeover valve for the
two-cylinder system
(part no. 51500-01)
EisEx regulator heating
(part no. 53101-01)
Angle union 90°
(part no. 50020-56000)
Gas remote switch
For turning off the gas supply
from inside the vehicle
GS 8
(part no. 57013-01)
GS 10
(part no. 57023-01)
Screwing tool
(part no. 50020-61500)
Test hose
(part no. 50020-61200)
Extension kit
required when gas cylinders
separated by more than 100 cm
(part no. 50020-61100)

Publicidad

Tabla de contenido
loading

Tabla de contenido