INSTRUCTION MANUAL
B. Set the triangular bracket using
the M10 screws to make the
required tilt angle. Loosen the M8
Allen screws to adjust the
rail to make the required tilt
angle according to the support
positioning and angling shown
on page 57, then tighten all the
screws.
C. Install the triangular brackets
on the base. The spacing
between them can be adjusted,
be careful to leave them
equidistant. Two rails will be
placed on them, so the distance
between the ends cannot exceed
the length of the rail.
Rail installation
A. Place the Rail on top of the
triangular bracket and secure it
with the Rail Clamp as shown in
the figure on the side. (Lock the
M8 Allen screw with the 6mm Allen
Key).
B. Repeat the step above using all
rail clamps, so that the distance
between the Rails is centered on
the top of the Triangular Bracket
and the rails are spaced 1200mm
apart.
Note: Make sure the rails are
aligned.
58
(The recommended torque for the M10 screw is 9 to 12 N.m
and the recommended torque for the M8 screw is 9 to 12 N.m)
Note: Make sure the tops of the triangular brackets are aligned and
EBARA BOMBAS AMÉRICA DO SUL LTDA.
3TSM ci/ce and 4TSM ci
at the same height
Models
Suggested
base height
(or pillars):
250mm.