Descargar Imprimir esta página

PRO LIFTS VMB TL-056 Manual De Instrucciones página 10

Torre elevadora
Ocultar thumbs Ver también para VMB TL-056:

Publicidad

Idiomas disponibles

Idiomas disponibles

Quick operation guide
C
B
A
Distance from the
load's center to the
lifting carriage
25 cm
A
(0.82')
30 cm
B
(0.98')
40 cm
C
(1.31')
50 cm
D
(1.64')
For large forks:
60 cm
E
(1.97')
from the handle of the winch will deform
the structure and apply a lateral force to
the lifts causing them to break and block.
Security system ILS
The TL-054 / TL-056 incorporates the ILS
security system (Inertial Lock Security).
PRO LIFTS S.L.
Diagram 4.6.1
E
D
Maximum load
TL-054 TL-056
220 kg
200 kg
(485 lb)
(441 lb)
198 kg
180 kg
(437 lb)
(397 lb)
165 kg
150
(364 lb)
(331 lb)
141 kg
128
(311 lb)
(282 lb)
123 kg
112 kg
(271 lb)
(247 lb)
Depósito legal y copyright 2014. Todos los derechos reservados.
ENGLISH
This VMB system automatically blocks
each profi le and the lifting carriage in the
unlikely event of cable breaking.
4.7 - Elevation:
Turn the winch crank clockwise (N
lift the carriage. The unique SRS system
(Sequence Retainer System) will ensure
that the profi les rise in sequence, one af-
ter the other.
4.8 - Hold:
The tower can be left in any intermediate
position if it is necessary. Just stop turning
the handle of the winch and leave it. The
automatic brake of the winch will block it
and hold the load.
4.9 - Lowering:
To bring the lift down you need to fi rst turn
the winch handle gently clockwise (N
release the clutch of the winch. Then turn
the handle anti clockwise (N
fi les have been completely lowered.
4.10 - Transport:
For the transport of the tower is necessary
to fold the machine lowering every profi le
completely. Once the towerlift is comple-
tely folded, place the legs in their trans-
port compartment (S) and the lift will be
ready to be transported.
1
) to
1
) to
2
) until all pro-
10

Publicidad

loading

Este manual también es adecuado para:

Vmb tl-054