Descargar Imprimir esta página

+GF+ SPC Manual De Instrucciones página 29

Publicidad

Idiomas disponibles

Idiomas disponibles

Operating Instructions
6
Putting into operation
WARNING!
Risk of injury due to improper operation!
Improper operation can lead to injuries as well as damage to the device and its surroundings.
► Before putting into operation, it must be ensured that the contents of the operating instructions are known to the operating per-
sonnel and have been fully understood.
► The safety instructions and the intended use must be observed.
► Only adequately trained personnel may start up the system/device.
CAUTION!
Damage or functional failure due to incorrect connection!
An incorrect pneumatic connection can damage the type SPC positioner. Prevent ingress of dirt and moisture with any open connec-
tions.
► Before putting into operation, ensure correct pneumatic connection according to the diagram.
► Perform a function test upon putting into operation.
► To maintain the IP65/IP67 protection rating, connect the control air outlet that is not required to the free control air connection
of the actuator or close it with a sealing plug.
6.1
Automatic adaptation of the operating conditions (X.TUNE)
NOTE!
To adapt the type SPC positioner to local conditions, the X.TUNE function must be executed after installation.
WARNING!
Hazard due to change of valve position when executing the X.TUNE function.
There is an acute risk of injury when performing the X.TUNE function under working pressure.
► Never run X.TUNE while the process is running!
► Secure the system against unintentional operation!
CAUTION!
Incorrect supply pressure or connected operating medium pressure may cause the regulator to maladjust!
► X.TUNE in any case at the supply pressure (= pneumatic auxiliary energy) available during subsequent operation.
► Preferably perform the X.TUNE function without operating medium pressure to exclude interferences due to flow forces.
Type SPC positioner
29

Publicidad

loading