Assembly instructions
63
61
37
2
Step 11
Important: Study and follow the diagram carefully.
Feed the bolt end of the 3100mm Upper cable (44) up through opening in Upper frame (2). Insert
Pulley bushings (37) into holes and attach 1
and M10 Nut ( 63 )
Washer(61)
X2.
Repeat procedure for 2
Place 3
rd
Pulley (33) onto the cable and fit Floating pulley brackets (10)
Attach 4
Pulleys (33 to Upper frame (2). Insert Pulley bushings (37) into the holes, attach Pulley's
th
(33) using with M10 Bolt(53)
Screw bolt on the end of Cable (44) securely into top of Select rod (13).
37
63
44
st
X1.
Pulley, feeding cable down though opening in Upper frame (2).
nd
M10 Washers (61)
X1.
53
50
63
pulley (33) using M10 × 70mm Bolt (50)
and M10 Nut ( 63 )
X2.
17
61
33
M10
X1.
X1.
10
53