Descargar Imprimir esta página

Uline H-1030 Manual De Instrucciones página 6

Ocultar thumbs Ver también para H-1030:

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Loosen the set screw with a 3 mm Allen wrench
to unlock the adjusting rod.
5. Slide the linkage mechanism and adjusting rod
simultaneously from the collar. (See Figure 20)
6. Loosen the screws with a 3 mm Allen wrench.
(See Figure 21)
7. Take off the spring pin with a hammer and 6 mm
straight rod. (See Figure 22)
Figure 22
PAGE 6 OF 24
OPERATION CONTINUED
VALVE AND TUBE O-RING REPLACEMENT
1. Loosen screws with a flat screwdriver. (See Figure 23)
Figure 20
2. Remove spring with needle-nose pliers.
(See Figure 24)
Figure 21
3. Remove C-ring with C-ring pliers. (See Figure 25)
C-Ring
Figure 23
Figure 24
Figure 25
0323 IH-1030

Publicidad

loading

Este manual también es adecuado para:

H-1031