Descargar Imprimir esta página

Angelo Po 1S1FA0GV Manual De Uso página 163

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

HANDLING AND INSTALLATION
WARNING: The connection opera-
tions must be carried out by qualifi ed per-
sonnel with an acknowledged experience in
the specifi c fi eld, in accordance with the ap-
plicable legislation in the country where the
appliance is installed.
The connection must be carried out with due
care and must comply with all applicable
regulatory and legal requirements. When
the connection is complete and before the
appliance is put into operation, a general
check for any gas leaks is required.
To make the connection, connect the mains
line to the connection pipe of the appliance, fi t-
ting a shut-off tap (A) for the gas supply cut-off
when necessary.
WARNING: The tap (A), which is not
supplied with the appliance, should be in-
stalled in an easily accessible position and
its status (on or off ) must be identifi able at
a glance.
WARNING: Before doing any work,
cut off the general power supply.
The manufacturer has tested the appliance
with its own mains gas, identifi ed by the
sticker applied to the nameplate. If the type
of gas to connected is diff erent from that
used for testing, proceed as follows.
Close the gas supply tap (A).
1)
Replace the top burner nozzles (see pag.17.
2)
Change the oven burner nozzle (see page
3)
17).
Replace the top burner pilot light nozzles
4)
(see page 17).
3386390_inst_GB_rev.1
GAS CONNECTION
must comply with the national requirements
in force and must be periodically checked
and replaced if necessary.
ance to the gas distribution system contain-
ing carbon monoxide or other toxic compo-
nents.
not be longer than 2 metres.
CHANGING THE GAS SUPPLY
C
AL
AL
AT
AT
BE
BE
BE
BE
BG
BG
A
IMPORTANT: The gas supply pipe
HAZARD: Do not connect the appli-
WARNING: The gas feed pipe must
II2H3B/P: G20/20mbar, G30/30mbar
II2H3+: G20/20mbar, G30-G31/28_30-37mbar
3P
II2H3B/P: G20/20mbar, G30/50mbar
II2H3P: G20/20mbar, G31/50mbar
II2E+3+: G20-G25/20-25mbar, G30-G31/28_30-37mbar
II2E+3B/P: G20-G25/20-25mbar, G30/30mbar
II2E+3P: G20-G25/20-25mbar, G31/37mbar
II2E+3B: G20-G25/20-25mbar, G30/30mbar
II2H3B/P: G20/20mbar, G30/30mbar
II2H3+: G20/20mbar, G30-G31/28_30-37mbar
ENGLISH
IS
II2H3B/P: G20/20mbar, G30/
IS
II2H3+: G20/20mbar, G30-G31/28
IT
II2H3+: G20/20mbar, G30-G31/28
IT
II2H3B/P: G20/20mbar, G30/
IT
II2H3P: G20/20mbar, G31/3
LT
II2H3+: G20/20mbar, G30-G31/28
LT
II2H3B/P: G20/20mbar, G30/
LT
II2H3P: G20/20mbar, G31/3
LU
II2H3B/P: G20/20mbar, G30/
LU
II2H3+: G20/20mbar, G30-G31/28
A
11

Publicidad

loading

Este manual también es adecuado para:

2s1fa0gv