Descargar Imprimir esta página

Carat P Serie Instrucciones página 85

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 65
Interval
yearly
in case of an error
in case of damage
ATTENTION!
Cleaning by a high-pressure cleaner will damage the machine.
Foaming and cleaning with water will damage the machine.
The diamond blade may not be cleaned by metal cleaning tools (scraper, metal sponge or similar), otherwise it will be
damaged.
STEPS AFTER COMPLETING MAINTENANCE
After completion of the maintenance works and before switching on, follow the following steps:
1. Check for tightness all threaded joints previously detached.
2. Check the proper installation of all previously removed protective devices and covers.
3. Make sure that all tools, materials and other equipment have been removed from the working zone.
4. Clean the working zone and remove any spilled substances such as liquids, processing materials or similar.
5. Make sure that all safety devices of the system function properly.
Maintenance work
Safety inspections of
- electric systems
- motor
Visual check
- of the entire machine
- of the cutter head and cutting table
Visual check
- water pump
re-tightening and adjusting cutter head and cutting table
change and replacement
- entire machine
- tool holder (flange and blade holder)
- tools (diamond blade)
- control elements (handles, locking rollers, etc.)
- water tank and hoses
- cutter head and cutting table
change and replacement
- electric systems
- motor
- Water pump
Personnel
Qualified electricians
Operating personnel
Specialist personnel
Operating personnel
Operating personnel
Qualified electricians
85

Publicidad

loading

Este manual también es adecuado para:

P-3510P-3512P-3515P-3520