2
1. Frontbeggertube
2. Lowerbaggertube
3.
1/4 x 50,8mmCarriage
Bolts
4.
1/4 Lock nut
2
1.
Front bagger tube
2.
1/4 x 50,8mm Carriage
Bolts
3.
1/4 Lock nut
4.
Vinyl Binding
5.
Dump handle tube
6.
Clevis pin
7.
Retainer spdng
8.
Cap
4
6MM (1/4") - 9MM (3/8")
1. Top Surfaces Even
2.
Hodzontal Adjustment Bracket
3.
Vertical Adjustment Bracket
To Assemble
Bagger
NOTE: For ease of assembly, you may wish to obtain the
assistance of another person when putting the bagger to-
gether.
•
Holes in front bagger tube are at an angle. Place front
bagger tube against lower bagger tube and check for
proper hole alignment before assembling belts.
Assemble front and lower bagger tubes using four (4)
1/4 x 50,8mm carnage bolts and lock nuts supplied.
Tighten securely.
•
Slide front and lower bagger tube assembly into the bag-
ger assemby.
•
Assemble front and upper bagger tubes using four (4)
1/4 x 50,8mm carraige belts and lock nuts supplied.
Tighten securely,
•
Slip all the vinyl bindingsover the bagger tubes
•
Slide the bagger dump handle through the hole in the
ba_.ger top, install the clevis pin and secure with retainer
spnng.
Push cap over end of bagger dump handle.
NOTE: For future use, the clevispin may be removed in order
to use the handle to clear the chute in the event it has become
clogged.
Bagger adjustment
For proper bag function and appearance, it may be neces-
sary to adjust the bagger assembly. There should be 6mm
(1/4")-9mm (3/8") gap between the bagger top and fender and
the bagger top surface should be even with the top surface
of the tender. To adjust bagger position:
Horizontal
adjustment
Slightly loosen the nuts securing the bagger RH and LH
horizontal adjustment brackets. Loosen only enough so
the brackets keep their position, but allow them to be
moved.
Move the brackets the amount forward or backward you
wish the bag assembly to move. Retighten the nuts se-
curely.
Vertical
adjustment
•
Slightly loosen the nuts secudng the vertical adjustment
brackets. Loosen only enough so the brackets keep their
position, but allow them to be moved.
•
Move the brackets the amount up or down you wish the
bag assembly to move. Retighten the nuts securely.
•
Reinstall the bagger assembly and check the bagger to
fender fit, If necessary, repeat the procedure until proper
fit is attained.
To convert
to bagging,
mulching
or discharge
See "Section 5" of this manual.
25