Descargar Imprimir esta página

LiftMaster CONTRACTOR 8160LA Manual Del Usuario página 5

Publicidad

Idiomas disponibles

Idiomas disponibles

Assembly
1 Attach the Rail to the Garage Door Opener
To avoid possible SERIOUS INJURY to finger from moving garage door opener:
ALWAYS keep hand clear of sprocket while operating opener.
l
Securely attach sprocket cover BEFORE operating.
l
To avoid SERIOUS damage to garage door opener, use ONLY those bolts/fasteners mounted in
the top of the opener.
NOTE: ONLY use the bolts removed from the garage door opener. Place the garage door opener on
the packing material to prevent scratching.
1. Remove the two bolts from the top of the garage door opener.
2. Align the rail and the styrofoam over the sprocket. Cut the tape from the rail, chain, and
styrofoam.
3. Fasten the rail with the previously removed bolts.
4. Position the chain around the garage door opener sprocket.
5. Install the sprocket cover by squeezing the sides and inserting the tabs into the slots on the
garage door opener.
Washered Bolt 5/16"-18x1/2"
2 Tighten the Chain
1. Loosen the inner nut and lock washer on the trolley threaded shaft.
2. Tighten the outer nut until the chain is a 1/2 inch above the base of the rail at the midpoint of
the rail.
3. Re-tighten the inner nut.
Slack in the chain is normal when the door is closed. No readjustment is necessary.
Sprocket noise can result if the chain is too loose. During future maintenance, ALWAYS pull the
emergency release handle to disconnect the trolley before adjusting the chain.
5
1/2" (13 mm)

Publicidad

loading

Este manual también es adecuado para:

Contractor serie