Preparation (cont.)
Temporarily install the sink in order to verify fit and position.
Ensure that the sink fits in the hole.
Verify the fit and position of the escutcheon. Ensure that the
control fits in the hole.
Remove the sink and the escutcheon. Store the components safely.
NOTE: The spout must be a minimum of 9" (22.9 cm) long and
13-7/8" (35.2 cm) high for adequate clearance into basins.
If installing faucets or other accessories, install them with
adequate clearance in accordance with the manufacturer's
instructions.
Kohler Co.
7
1032055-2-B