Descargar Imprimir esta página

Nuova Simonelli OSCAR II Instrucciones De Manejo página 33

Ocultar thumbs Ver también para OSCAR II:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

2.3 PREPARATION OF THE DIRECT CONNECTION VERSION
1.
Open the door and remove the pipe for
direct connection.
2.4 STARTING THE MACHINE AND FILLING THE HEATER
1.
Connect the machine to the power socket.
2.
Press the switch on the right side, the
push-button panel lights up and the
machine automatically loads the water
into the heater (initial time 3 minutes).
3.
When the level is reached, heating starts
indicated by the resistance light.
4.
It is recommended to change the water in
case it is not used for over 8 hours.
1.
Connect the pipe to the water mains and
open the tap upstream of the machine, if
any.
2.
Make sure that the water collection tray is
properly inserted.
1.
Wait for the resistance light to switch off.
This means that the water is at tempera-
ture.
2.
Once the water has been filled, press the
dispenser button until water comes out of
the unit.
3.
The preparation of the machine is finished
and it is ready for making coffee.
B
A
1.
Make sure that the cup support grid is
positioned correctly and level (A).
2.
Check that the steam lever is in the off
position (B).
3.
Check that the mains voltage corresponds
to the information on the back.
4.
The machine is ready for setting.
• NOTE: the machine is provided with an elec-
tronic self-levelling device, therefore it automat-
ically replenishes the water in the heater.
• NOTE: For best results the machine must
reach temperature in all its parts, the time
required varies between 15 and 20 minutes from
switching on.
• NOTE: If after 90 seconds the water level in
the heater has not been reached, the pump
stops and the 4 LED lights on the control panel
start blinking.
The machine must be turned off and on again
to resume filling with water.
• NOTE: If the water level control light comes
on, it means that the water tank is empty or
about to empty.
33

Publicidad

loading