Descargar Imprimir esta página

Ablerex Ares 230V-1K Manual De Instrucciones página 11

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 65
ARES UPS User Manual
Installation of Accessories Kit
Tower installation
Rack Mount installation
Step 1
S2
S1
S2
Step 2
S1
Selecting Installation Position
The UPS is heavy. Select a location sturdy enough to support the UPS weight.
To ensure proper operation and long operating life, position the UPS according to the following require-
ments.
1. Keep at least 20 cm (8 inches) side and rear clearance away from walls or any obstructions.
2. Ensure the air vents on UPS are not blocked. Allow adequate space for proper ventilation.
3. Ensure that the installation site is free from excessive dust and the ambient temperature and humidity
are within the specified limits.
4. Do not place the UPS in a dusty or corrosive environment or near any flammable objects.
5. This UPS is not designed for outdoor use.
11

Publicidad

loading

Este manual también es adecuado para:

Ares 230v-2kAres 230v-3k