Descargar Imprimir esta página

Progress Lighting P250105 Manual De Instrucciones página 9

Publicidad

Idiomas disponibles

Idiomas disponibles

Outlet box
Black (hot)
Black ("AC IN L")
Receiver
White
Black ("to motor L")
("to motor N")
Ground (green)
(Connect to ground
wire on hanger bracket
if no house ground wire
Blue (for light)
exists.)
Black (motor)
Figure 11
Finishing the Installation
Step 1. Tuck connections neatly into ceiling outlet
White (neutral)
box.
Green or bare
copper (ground)
Step 2. Slide the canopy up to mounting bracket and
White ("AC IN N")
place the key hole on the canopy over the screw on
the mounting bracket, turn canopy until it locks in
place at the narrow section of the key holes. (Fig.
12)
Step 3. Align the circular hole on canopy with the
remaining hole on the mounting bracket, secure by
White (neutral)
tightening the two set screws. Note: Adjust the
canopy screws as necessary until the canopy and
canopy cover are snug.
Make sure the notch on the hanging bracket properly
sits in the groove in the hanger ball before attaching
the canopy to the bracket by turning the housing until
WARNING
it drops into place.
Outlet box
Hanger
bracket
Canopy cover
Figure 12
Screws
Canopy
6.

Publicidad

loading

Este manual también es adecuado para:

109226