Descargar Imprimir esta página

MD SPORTS 57000 Instrucciones De Armado página 6

Publicidad

Idiomas disponibles

Idiomas disponibles

FIG. 4
6. Connect Base Tubes (#5) to the assembled Side Braces (#6) by using Bolts (#21) and
Washers (#24) as shown in FIG.4.
ae
#5
#6
#4 #24
|
FIG. 5
7. Connect Back-Upright tubes-B (#10) to assembled tubes (#9) by sliding them together and
locking in the place as shown in FIG. 5. Then, connect the Tubes (#11) to assembled
tubes (#10) by sliding them together as shown in FIG.5.
8. Connect the upper sides of L Support Tubes (#7) and Support Tube-A(#2) to the tube
assembly (#11 and #10) by using two Bolts (#21), two Washers (#24) and two Locknuts
(#26) per side. Then, slide the
lower sides of L Support Tubes (#7) to the assembled tubes
(#5) together.
9. Connect the Support Tube-A (#2) to the assembled tubes (#7 and 5) by using Bolts (#21),
Washers (#24) and Locknuts (#26).
Note: Make sure all the Bolts, Washers and Locknuts go from the same directions
as shown in FIG.5.
Le
Spring Lock

Publicidad

loading