Descargar Imprimir esta página

American Standard Aspirations T061901 Manual Del Propietário página 5

Salida de tina de montaje bajo cubierta
Ocultar thumbs Ver también para Aspirations T061901:

Publicidad

Idiomas disponibles

Idiomas disponibles

5
HAND SHOWER INSTALLATION
• Place RUBBER WASHER (2) in recess of HAND SHOWER HOLDER (1).
• Unthread and replace hand shower plug with HAND SHOWER
HOLDER (1).
• Thread HAND SHOWER HOLDER (1) until it is angled towards the
tub center.
• Place the RUBBER WASHER (7) in to the longer conic end of the hose.
• Thread the HAND SHOWER (9) on to the longer conic side of the hose.
• Unthread HAND SHOWER HOLDER COLLAR (4) and feed SHOWER
HOSE (6) through COLLAR (4) and the HAND SHOWER HOLDER (1).
Tighten COLLAR (4) until snug.
• Place the second rubber washer (7)
in the recess of the opposite end of
the hose. Thread hose on to the rough
extensions hose (8).
D
6
TESTING FOR LEAKS
• Connect HOT water supply to LEFT INLET UNION (1) and COLD water
supply to RIGHT INLET UNION (2). Pipe connections are 3/4" NPT.
Use sealant or Teflon tape on pipe connections. Do not solder directly
to valve body.
TEST INSTALLED FAUCET
• With HANDLES in OFF position, turn on
WATER SUPPLIES and check all connections
for leaks.
• Operate both HANDLES to flush water lines
thoroughly.
• Lift HAND SHOWER from HOLDER, direct
spray into tub. Lift TRANSFER KNOB to check
HAND SHOWER and HOSES for leaks.
• Turn handles "off" and replace HAND SHOWER.
7
CARE INSTRUCTIONS
DO: SIMPLY RINSE THE PRODUCT CLEAN WITH CLEAR WATER. DRY WITH A SOFT COTTON FLANNEL
CLOTH.
DO NOT: DO NOT CLEAN THE PRODUCT WITH SOAPS, ACID, POLISH, ABRASIVES, HARSH CLEANERS,
OR A CLOTH WITH A COARSE SURFACE.
5
3
8
TRANSFER KNOB
HOT
1
3/4" X 3/4" NPT UNION
(NOT SUPPLIED)
IMPORTANT: It is strongly recommended that access be
3/4" NPT
provided for all enclosed mechanical parts to this system.
9
1
6
7
HAND
SHOWER
COLD
2
3/4" NPT
7
4
2

Publicidad

loading