Descargar Imprimir esta página

Thermador PH Professional Serie Manual De Instalación página 11

Ocultar thumbs Ver también para PH Professional Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

Wall
Ae.
a
1-1/8"
93
B
> 2-308"
|
+
~
7-7/8"
o/s
2-3/8"
Cooktop
, I<
>
=
Centerline
er
5/8" DIA clearance
holes for 1/2" conduit
to J-box.
Pian View of Cabinet Cutout
Note:
This figure depicts transition and conduit
locations only. See Figure 2 on page 4 for overall
hood dimensions.
Figure 12: Transition and Conduit Locations
For horizontal discharge, use Figure 6 for the geometry
of the cutout required for clearance of the transition.
Hang hood from screws and tighten securely.
From inside of hood, insert screws supplied. Drill
through holes (use #8 x 5/8" screws supplied), one (1)
on each side and four along the front, into bottom of the
cabinet. See screw holes labeled "L" in Figure 11.
Centerline Hole Dimensions for Figures 11 and 12
HOOD
B (Fig 12)
SIZE
Tap Holes
Conduit Holes
30"
29-1/16"
13-7/16"
36"
35-1/16"
16-7/16"
42"
41-1/16"
19-7/16"
48"
47-1/16"
22-7/16"
54"
53-1/16"
25-7/16"
Installing an Integral Blower,
Model VTN630C or VTN1030C
The hood can be installed with a model VTN630C or
VTN1030C
integral blower.
Blower Preparation
Wire tie
Capacitor
Blower Front View
Figure 13: Blower Front View
Remove left and right shipping brackets and discard.
Cut wire tie shown in Figure 13. Locate the wire
harness with the Molex 6-pin connector. Route wire
harness out rear of blower, as shown in Figure 14
below.
Re-attach wire harnesses to capacitor with new wire tie
(supplied) in same location in front.
Attach wire harness with Molex 6-pin connector to
housing as shown in Figure 14 with wire tie (supplied).
Add wire
tie here
Harness
Blower Rear View
Figure 14: Blower Rear View
English 9

Publicidad

loading