Martin Yale Industries Intimus POWER 16.87 Instrucciones De Uso página 14

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

GB
BALER OPERATION
USING THE BALER:
TYING OFF THE BALE (fig. 9, 10, 12, 16):
The strap brake (28) (fig. 16) must be closed
1. Open the inlet flap (30).
(move lever to right).
2. Open the strap brake (28) (fig. 16).
Note: If baling is to be performed without subse -
3. Pull the straps to approximately 40 cm above
quent tying off, refer to "EJECT INTO PLASTIC
the baling ram with the help of the strap lifters
SACK WITHOUT TYING OFF".
(33) and the included strap hook (fig. 9).
4. Firmly hold the straps and return the strap lifters
FEEDING THE BALER VIA THE SHREDDER:
to their original position.
When the baling chamber and the inlet funnel are
5. Loosen the strap ends (34) which have been
filled with material from the shredder, the compact -
secured to the baler housing, knot them to -
ing cycle is started:
gether with the respective straps pulled out in
The baling ram (32) advances, compacts the
the preceding step (fig. 10) and cut the strap
material and then returns to home position. The
behind the knot with a pair of scissors (fig.
shredder may be fed while the baler is compact
-
12).
ing.
6. Close the inlet flap (30).
FEEDING THE BALER MANUALLY:
OPENING THE DISCHARGE FLAP (31):
Do not compact aerosol con
-
1. Press and hold the "Open Discharge Flap"
tainers such as spray cans etc.
key (16) for at least 2 seconds. The baling
(danger of explosion)!
ram travels a short distance in reverse, and
Non-confidential materials can also be fed manu
-
the locking lever (35) travels a short distance
ally to the baler. Return the baling ram to its rear,
forward in order to relieve pressure at the
home position if necessary (close the inlet flap
discharge flap.
and press the "Return Ram" key (17) (fig. 8)) and
2. Slightly lift the locking lever (35).
proceed as follows:
3. Swing the discharge flap down.
1. Open the inlet flap (30) (fig. 2).
2. Insert material into the baling chamber.
A) TIE OFF AND EJECT
3. Close the inlet flap and activate the „Advance
INTO PLASTIC SACK (fig. 11 and 13):
Ram" Key (15) (fig. 8).
1. Close the inlet flap (30).
The baling ram (32) travels forwards (compact
-
2. Open the discharge flap (31).
ing cycle) and, when the compaction procedure
3. Press and hold the "Advance Ram" key
is complete, returns to its home position. Feed
-
(15) (fig. 8). The completed, tied off bale is
ing may now be continued.
ejected into the plastic sack and is pushed
onto the discharge flap (fig. 11).
EJECTING THE COMPLETED BALE:
For reasons of safety, advance and
When, after several compacting cycles, the bal
-
reverse ram travel is only possible
ing ram (32) no longer returns to home position,
in inching operation when the dis
but rather remains pressed against the bale,
charge flap is open. The key must
maximum bale volume has been reached. The
thus be pressed and held in order
bale must be tied off and ejected. A
horn sounds
to eject the bale!
to indicate this.
4. Remove the sack from the sack frame
Confirm the „bale ready" mode by operating the
(36).
„Stop Cutter" pushbutton (4) (fig. 6). The horn
5. Fold the end of the sack together and seal
stops.
with tape (fig. 13). The bale can now be
Note: The shredder cannot be started while
removed.
the bale is being tied off and ejected (inlet and
discharge flaps are open).
B) TIE OFF AND EJECT
The bale can be ejected in three different ways,
WITHOUT PLASTIC SACK:
and then removed.
Same as described under "
A) Tie off and eject into plastic sack (for small
plastic sack is used. The bale can be removed
particles) (fig. 9, 10, 11, 12 and 13)
immediately after ejection.
B) Tie off and eject without plastic sack (for large
particles) (fig. 9, 10 and 12)
C) EJECT INTO PLASTIC SACK
C) Eject into plastic sack
without tying off (for
WITHOUT TYING OFF (fig. 11 and 13):
small particles) (fig. 11 and 13)
Note: In this case, the tie-off straps which have
Note: Suitable sacks and straps can be ordered
been laid out inside the baling chamber must
at any time (see "ACCESSORIES).
be removed and rolled back onto the strap
rolls (41).
1. Close the inlet flap and open the discharge
flap.
2. Press the bale into the plastic sack and
onto the discharge flap by activating the
"Advance Ram" key (15) (fig. 11).
3. Fold the end of the sack together and seal
with tape (fig. 13). The bale can now be
removed.
4. Return the baling ram to home position by
pressing the "Return Ram" key (17) and
close the inlet flap.
Note: This is only possible in inching opera
tion when the discharge flap is open.
16.87
INSTALLING A NEW PLASTIC SACK (fig. 15)
Note: If the bale is to be tied off, the straps must
be laid out as described under "INSERTING
STRAPS FOR A NEW BALE" before the sack is
installed to the sack frame (36) (fig. 14) (does not
apply for option " C ").
1. Open the discharge flap and return the baling
ram to its rear, home position. The inlet flap
remains closed.
2. Push the sack bit by bit over the sack frame
(36) until the entire sack has been mounted to
the frame.
3. Close the discharge flap.
INSERTING STRAPS
FOR A NEW BALE (fig. 14, 16 and 17):
1. Return the baling ram to home position by
pressing the "Return Ram" key (17).
Note: This is only possible in inching operation
when the discharge flap is open.
2. Open the inlet flap.
3. Pull the straps out a distance equivalent to
about one flap length, guide the strap ends
from the inside over the strap hook (37),
through the inlet opening and up to the strap
clamps (38) (fig. 14). Secure the strap ends
here by wrapping them twice around the
clamps.
4. Close the strap brake (28) (fig. 16).
Note: In order to allow for subsequent tying
off of the bale, the strap brake must be closed
before the compacting cycle.
5. Close the discharge flap (31), as well as the
inlet flap (30), if the shredder is to be used.
Attention: In order to avoid damage to the
straps, it is advisable to refrain from compact
-
ing bottles, glass or other objects with sharp
edges such as sheet metal etc.
REPLACING THE
STRAP ROLLS (41) (fig. 16, 17 and 18)
1. Close the inlet flap and advance the baling ram
about 30 cm .
2. Open the inlet flap and remove both strap lifters
(33).
3. Open the strap brake (28) (fig. 16).
4. Insert the strap rolls (41) in to the strap roll
holder (40) as shown, with the strap ends
A) ", except no
pointing down (fig. 17).
5. Secure the strap end to the loop on the included
pull cable and feed the other end of the pull
cable (45) (fig. 17) through the opening at the
strap brake (28) and into the strap guide (39)
(fig. 17). The strap can now be pulled through
the strap guide with the pull cable, until it is
visible within the baling chamber.
6. Loosen the strap end from the pull cable as
shown, feed it through the strap lifter (33) and
set the strap lifter back into place at the baling
ram (32) (fig. 18).
7. Insert both straps as described under "IN
SERTING STRAPS FOR A NEW BALE" and
close the strap brake (28) (fig. 16).
8. Close the discharge and the inlet flaps and re
turn the baling ram to its rear, home position.
-
14
SCHALTBILD / WIRING DIAGRAM / PLAN DE MONTAGE / DIAGRAMA ELÉCTRICO
ESQUEMA ELECTRICO / SCHEMA ELETTRICO / SCHÉMA ZAPOJENÍ
-
-
-
16.87
59

Publicidad

Tabla de contenido
loading

Tabla de contenido