Descargar Imprimir esta página

Julabo Peltier TE400 Manual Del Operacion página 114

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 119
Decommissioning and Disposal
16 Decommissioning and Disposal
16.1 Temporarily Placing Out of Operation
The decommissioned unit must be stored in a dry and dust-free room.
For recommended storage conditions, refer to Storing the Unit
Prior to Decommissioning
Procedure
1. Finish the cooling operation.
2. Disconnect the unit from mains.
3. Let the unit and the coolant cool down.
4. Disconnect coolant hoses from the unit. Refer to Disconnect Hoses.
5. Drain the coolant. Refer to Draining Procedure
6. Clean the unit. Refer to System Maintenance and Service.
7. Secure the coolant inlet and coolant outlet connections with protection
 The unit has now been decommissioned.
114
DANGER
Electrical danger!
Work on electrical installations may be carried out by trained and authorized
electricians only.
Switch off the unit before starting your work.
Disconnect the unit from mains by pulling the mains plug.
Secure the unit against being switched on again.
Verify that the unit is disconnected.
Carry out necessary earthing connections.
Keep unauthorized persons away from the working area.
caps against soiling.

Publicidad

loading

Este manual también es adecuado para:

9635400