Descargar Imprimir esta página

Vortice VORT HR 450 AVEL D Manual De Instrucciones página 32

Ocultar thumbs Ver también para VORT HR 450 AVEL D:

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 102
ENGLISH
7
Installation
7.1 Assembly
The device is equipped with three rails to be used for wall mounting. One of the two upper rails is pre-assembled on the
device (fig. 2 ÷ 6).
If it necessary to fix the product to the wall, be sure to use the brackets and screws to fix it.
ATTENTION: Before fixing the support brackets, make sure to maintain the distance for the connection of the ventilation
pipes and the condensate drain from the ceiling and floor as shown in fig. 2.
2
5
7.2 Connecting the condensate drain tube
The connection point is located on the bottom of the device. The condensate drain must be implemented by connecting the
supplied flexible hose to the condensate drain connection. A siphon must be made with the tube (fig. 7,8) to prevent the
formation of air bubbles.
7
32
3
6
8
4
h > 50 mm
≥ 60 mm

Publicidad

loading

Este manual también es adecuado para:

Vort hr 450 avel d h1091012101