Descargar Imprimir esta página

GPI G20 Serie Guía De Solución De Problemas página 8

Bomba de transferencia de combustible

Publicidad

Idiomas disponibles

Idiomas disponibles

REPAIR
IMPORTANT: Carefully inspect all parts for wear or damage. Replace
components, as necessary. The Illustrated Parts List gives information on
replacement parts and kits. Review the Safety Instructions before proceeding.
Observe precautions against electrical shock when servicing the pump. Always
disconnect power before repairing or servicing. Never apply electrical power to the
system when any of the coverplates are removed.
Avoid prolonged skin contact with petroleum fuels. Use protective goggles, gloves
and aprons in case of splashing or spills. Change saturated clothing and wash skin
promptly with soap and water.
Service O-rings
NOTE: A Wet Seal Kit contains all seals for your pump and should be
on hand when performing repairs. Old seals may then be replaced with
new seals.
1.
In general, when inspecting O-rings, look for breaks, wear, and signs
of deterioration, such as swelling.
2.
Replace, as necessary.
3.
Before seating, coat O-rings with light grease.
8
EN

Publicidad

loading

Este manual también es adecuado para:

G20-012adG20-012pxG20-012md162000-03162000-04