Descargar Imprimir esta página

Cinderella JUBILEE EM03CS10 Manual Del Usuario página 12

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 183
2.7 CHECKLIST TO VERIFY THE COMPLETE INSTALLATION
CONTROL ITEMS
The connected voltage is in accordance with the appliance rating plate
The flue pipe length is according to manufacturer specifications
The flue termination is no less than 600 mm from the roof surface
Safe draining "siphon" is installed where condensation is likely to accumulate
Flue pipe material is installed according to manufacturer specifications
Flue cap is installed according to manufacturer specifications
2.8 PERFORMANCE TEST TO VERIFY THE SYSTEM FUNCTIONALITY
Insert a bowl liner and fill it with 1 meter of toilet paper and 1,2 liters of water. When the "Start" button is
pressed, the incineration cycle will be activated. The estimated incineration time for the verification test is
approximately 60 – 80 minutes. The yellow light will be lit when the incineration is ongoing, and the complete test
should be completed without any fault indications or system interruptions. The toilet will have to cool down to
the point that the fan has stopped before the ash container can be removed. The cooling phase can take from 60
– 90 minutes, depending on the ambient cooling temperature.
The end result should only be fine white dust. Any end results deviating from this or an incineration time
exceeding 90 minutes may indicate a restriction in the flue vent or a lack of oxygen. Check that the installation is
in accordance with the manufacture specifications, presented in section 2 of this manual.
1
4
WARNING!
The ash container will get very hot while incinerating. Do not remove the front lid until the
toilet has cooled completely and the fan has stopped.
NOTE!
The performance test is designed to be performed when the toilet has not been used.
Results may vary when performing this test on used
12
2
5
CONFORMANCE
3
1m
1,2l
6
120-170 Minutes
60 - 70 minutes
toilets.

Publicidad

loading