EN Maintenance
• Repairs should only be
implemented by trained
personnel.
• Remove test leads from
measurement circuits before
opening the battery cover.
• In order to avoid incorrect
readings that may cause damage
or personal Injury, replace
batteries as soon as the "
symbol appears.
• Before using the test leads to test
the 60 V DC or 30 V AC, please
test on the mains supply
(e.g. 220 V) and check if voltage
can be displayed correctly.
• The device is with of fast-blow
fuse 400 mA/600 V. Please use
same specification of fuse when
replacing the fuse.
• Use a damp cloth and mild
detergent to clean the meter. Do
not use abrasives or solvents.
• Move the rotary switch to the
OFF position when the meter is
not i n use.
• Remove the batteries if the
meter is not going to be used for
an extended period of time.
87_5059340213873_BODNER_A6_IM_MULTI_V03.indd 65
87_5059340213873_BODNER_A6_IM_MULTI_V03.indd 65
EN Maintenance
WARNING! To prevent electric
shock and damage to the meter or
personal injury, remove test lead
before opening battery cover.
Replacing the Batteries
• When the"
it indicates the batteries need to
be replaced.
• Unscrew the battery cover and
remove it from the meter.
"
• Replace the used batteries with
new AAA batteries.
• Replace the battery cover and
secure it to the meter.
Replacing the test lead
(or alligator clip)
WARNING! Replacement leads
must be of the same rating or
higher as the leads supplied with
the meter: 600 V 10 A.
If the test lead's insulation is
damaged or has any wires exposed,
the leads need to be replaced.
65
" symbol appears,
8/7/2021 2:46
8/7/2021 2:46