Indoor Pan/Tilt Head AW-PH400
Installation
When installing onto a major structural
component (such as plaster board)
Ceiling
panel
[Installation on an H steel beam above the ceiling]
<Positions and dimensions of mounting holes>
AC inlet side of pan-tilt head
Check the positions and dimensions of the mounting holes, the dimensions of the penetrated hole in the
ceiling panel, and check which is the AC inlet side as shown above. Then decide in which direction the pan-tilt
head is to be mounted, and drill the holes for the hangers and for the penetrated hole in the ceiling panel.
p Provide a hanger that can be coupled with the H steel beam above the ceiling, and attach the pan-tilt head to it.
Notes
p Be absolutely sure to use the bolts or nuts and flat washers and spring washers for the installation.
(Be sure to ask your dealer to install the unit.)
H steel beam above ceiling
7 mm or more
4-M6 holes (for mounting the
pan-tilt head)
M8 hole (for mounting the
85 mm
underneath support plate)
p Avoid installation on a structural component that cannot provide the
prescribed strength.
Hanger
• M8 bolt
• Spring washer
• Flat washer
• M6 bolts
• Spring washers
• Flat washers
[Installation directly onto the ceiling]
<Ceiling panel: Penetrated hole dimensions>
Hanger
Wire routing hole
(reference)
19 (E)
Ceiling
• M6 nuts
• Spring washers
• Flat washers
7 mm or more
• M8 nut
• Spring washer
• Flat washer
Drilling the hole in
the ceiling panel
16 mm
93 mm
Protruding part
of the underneath
support plate
AC inlet side of pan-tilt head