Erreka VULCAN VU31LB Manual Del Instalador página 48

Accionador hidráulico para puertas batientes
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

INSTALLATION
Connect the operator to the switchboard
CLOSE OPEN
1
Motor connection (common)
2
Motor connection (turning 1)
3
Motor connection (turning 2)
4
Earth
Position the end cap and tighten the gland
48
Installation manual
125V: 30µF
230V: 10µF
1 2 3 4
Before making any electrical connections,
check the switchboard instructions manual.
We recommend using the VIVO-M101(M), VIVO-
M201(M), VIVO-M203(M), VIVO-I103(M) or VIVO-
I203(M) switchboards.
1 Connect the operator to the switchboard.
2 Connect the capacitor (C) in cable connectors Turn
1 and Turn 2.
3 Connect the closing (FCC) and opening (FCA) limit
switch.
4 Connect the switchboard to the electricity supply.
5 Activate the power supply switch.
Before carrying out any gate movement,
ensure there is no person or object in the radius
of action of the gate and the drive mechanisms.
6 Use the switchboard mini-pushbuttons (CLOSE-
OPEN) to check the motor connections are correct
(turning direction).
If
the
turning
direction
interchange the cables 2 and 3.
Ensure the earth cable is properly connected.
1 Position the end cap (1) in its housing (2) and attach
using the screws (3).
2 Tighten the gland (4) to ensure the electrical cable
input (5) is seal tight.
is
not
correct,

Publicidad

Tabla de contenido
loading

Tabla de contenido