Mounting
Unpacking and check
The RisePorto package includes the following:
1 RisePorto lift unit
1 hand control
1 user manual
1 charger
1 key for manual emergency lowering
Check to ensure that no parts have been left in the packaging.
Check to ensure that the lift has no signs of damage from transportation.
NOTE!
The lift unit and the trolley must be installed and first-time inspected by authorized personnel (inspector) in
accordance with the installation instructions provided by Handicare AB. Periodic inspection of the equip-
ment should be undertaken at least once a year. Original spare parts should be used and service/mainte-
nance of the equipment should be in accordance with the user manual.
The lift unit must be charged for at least 3 hours before first- time use.
Different rail systems
The choice of rail system is determined by the lifting needs at hand.
Rail systems with full room coverage,
in bedroom and bathroom
Rail system with full room coverage,
above bathroom wall
SystemRoMedic
M A N U A L
TM
Basic rail systems,
with curves and turn table
Freestanding lift stand
5