• Floor Mounting / Bodenmontage / Montage au sol / Montaje en suelo / Montagem em
pavimento / Vloermontage / Montaggio a pavimento / Montaż podłogowy / Montáž na
podlahu / Golvmontering / Montare pe pardoseală / Подов монтаж / Gulvmontering
/ Στερέωση στο δάπεδο / Põrandakinnitus / Lattia-asennus / Montaža na pod / Padlós
szerelés / Montavimas ant grindų / Grīdas montāža / Montáž na podlahu / Montaža na
tleh / Zemine montaj / Montagem no chão / تصاعد الكلمة
The mode of floor mounting is given priority for installation. Option B (three battery
modules in one tower) is taken as an example.
One Tower
Step 1 Prepare and install the battery base and battery modules.
Base
1
*Note: Remove dust covers from the base, battery module, and BMS before conducting installation.
The side with "R" shall be against
the wall.
Place a spirit level to check
whether the base is even.
2
If yes, refer to the step 4.
If no, refer to the step 3.
Battery module
Rotate the adjustment screws to ensure the base is even.
Turn clockwise, lower the base.
Turn anticlockwise, raise the base.
3
BMS
Front
117