SOLAX X3-IES-4K Manual De Instalación página 138

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 17
Two Towers
Take the installation procedure for six battery modules as an example.
As for the installation steps for the following figure,
please refer to the Steps 1~22 of the Wall Mounting
to install the left tower and refer to the Steps 1~15
for the installation procedure of the right tower.
Please leave 250~300 mm between the two
towers.
22
4 screws shall be tighten.
*Note: The side of the series box with "R"
shall be against the wall.
23
*Note: The cover that covers on the series box shall be installed after finishing wiring. As
for the installation procedure of the cover, please refer to the section of "Installation of
Cover".
134
M5 * 14
2.2-2.5 N·m