Power on the System
Power on the System / Schalten Sie das System ein / Mise sous tension du système
/ Encienda el sistema / Ligue o sistema / Het systeem inschakelen / Accensione del
sistema / Włączanie systemu / Zapnutí systému / Slå på systemet / Pornire sistem
/ Включване на системата / Tænd for systemet / Ρεύμα στο σύστημα / Süsteemi
sisselülitamine / Kytke järjestelmän virta päälle / Napajanje sustava / Rendszer áram
alá helyezése / Įjungti sistemą / Ieslēdziet sistēmu / Zapnite system / Vklopite sistem /
Sistemin Gücü / Ligar o sistema / ‫قم بتشغيل النظام‬
Step 1:
This step differs with or without X3-Matebox G2.
Without X3-Matebox G2
»
Turn on the AC breaker and check whether the LCD screen lights on. If the
LCD screen is not on, turn off the AC breaker and check whether the Grid
cable is conected correctly and securely.
With X3-Matebox G2
»
Ensure that the inverter DC switch, the inverter system BUTTON and the
main breaker between X3-Matebox G2 and the power grid are turned off.
»
Turn on the Grid(INV) breaker, the EPS(INV) breaker, the Grid breaker and the
load breaker in the matebox.
»
Turn on the main breaker. Check whether the inverter LCD screen lights on.
If the LCD screen is not on, turn off the main breaker and check whether the
Grid cable between the inverter and the matebox and between the matebox
and the power grid are conected correctly and securely.
»
Lock the enclosure of X3-Matebox G2.
Step 2: Turn on the inverter DC switch and check, check the PV voltage through the
path: Menu> System Status > PV1/ PV2. If the PV voltage is 0, turn off the DC
switch, pull out the PV connetors, and then measure the voltage of the positive
EPS
L2 L3
PE L1
N
Grid
Main breaker
L1
L2
L3
N
Grid
AC breaker
Loads
165