Descargar Imprimir esta página

Best Potenza CP57IQT Serie Instrucciones De Instalación página 11

Ocultar thumbs Ver también para Potenza CP57IQT Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

15. PERFORM THE EXTERNAL BLOWER CONNECTIONS (CP57E S
Do not plug the two cords together.
To install the blower see instructions included with the blower.
Plug the 3-prong plug cord from rough-in plate to the 3-prong male connector
inside the power pack (A) and the 2-prong male connector cord from rough-in
plate to the 2-prong plug inside the power pack (B).
16. REINSTALL BOTTOM PANEL
Lift the bottom panel and engage the power pack metal tabs in
bottom panel slots, as shown in details A and B below.
A
HO0121
17. REINSTALL GREASE DRIP RAIL
A. Insert one end of grease rail in power pack side ()
while lifting the other end over the bottom panel
edge ().
B. Center the grease drip rail over the bottom panel
edge and flip it to snap in place.
WARNING
!
S
IDE VIEW
B
HE0078
Secure the bottom panel to the power pack using its screws
previously removed in step 7.
A
HD0525
11
B
A
R
ETAINING SCREW LOCATIONS
HO0224
HD0524
)
ERIES ONLY
B

Publicidad

loading