Horizontaldischargeinstallation - Broan Elite E60000 Serie Manual Del Usuario

Ocultar thumbs Ver también para E60000 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

8. HORIZONTALDISCHARGEINSTALLATION
(INTERNAL BLOWER(S)HOOD ONLY)
All internal blower hoods are factory shipped with the blowers mounted for a vertical discharge configuration.
For a horizontal
discharge configuration,
disassemble the blower(s) from the inner top of the hood and mount it (them) to the inner back panel
of the hood. The procedure below applies for one or two blowers.
Using
a 5/16" socket,
remove all
blower mounting
screws from the
inner top of the hood. Keep the
screws for further use.
Slide the blower to disengage
its flange from the
retaining bracket.
Rotate the blower and engage its
flange
in the back wall retaining
bracket.
Using
a
5/16"
socket
and
the
screws previously removed, secure
the blower to the hood.
SCREW
-9-

Publicidad

Tabla de contenido
loading

Tabla de contenido