IMPORTANT! Read these instructions thoroughly
and familiarize yourself with all controls and
operating features. Keep these instructions for
future reference and maintenance.
Unpacking: Check the machine for damage. If
damage is found, return to Uline.
BEFORE USING THE MACHINE
After removing the machine from the carton, check the
following items before storing the shipping cartons:
HEATER SETUP (FOR H-669 ONLY)
1.
Locate the heater kit box.
2. Remove retaining ring. (See Figure 2)
Figure 2
Retaining
Ring
3. Remove shaft and gold rollers and set aside.
4. Install heater shaft with silver rollers from spare parts
bag. (See Figure 3)
Figure 3
Shaft
5. Use replacement retaining ring provided to hold the
shaft in place.
PAGE 2 OF 15
GENERAL INFORMATION
• Brush Tank and two Moistening Brushes: These are
• Plastic Water Bottle: This is packed on the side of the
• Upper Tape Plate: This is held
SETUP
6. Direct the heater cord under the bottle bracket. Place
SETUP
1.
With the slot toward the front of the machine, slide feed
wheel shaft under from rear until the cut-out portions
are over the retaining buttons. Allow the plate to slide in
place so the front end of the plate is under the rod, and
the rear portion is under the buttons. (See Figure 5)
packed inside the rear of the machine.
dispenser.
in position by packing
material, but may have
become dislodged in
shipping. Remove tape, etc.
before using the machine.
(See Figure 1)
cord clamp on heater cord and, using screw and nut
provided, fasten to existing hole. (See Figure 4)
NOTE: Ensure there is enough slack in the cord
near the heater so the heater assembly can
pivot freely up and down.
Figure 4
Bottle
Bracket
If the upper tape plate has been dislodged in
shipping, replace as follows:
Retaining
Buttons
Feed
Wheel
Shaft
Rod
Figure 1
Cord
Clamp
Figure 5
0724 IH-35