Erreka FENIX Manual Del Instalador página 59

Accionador de techo
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Procedure
Mark the assembly points
Position the front track support
Position the door anchoring
See "Assembly positions and levels" on page 54.
1 Mark the points to mount the front support (1), the
door anchoring (2) and the overhead strips (3).
1 Choose screws which are suitable for the place of
attachment (metal, brick, wood, etc) and the weight
and effort of the actuator.
Use appropriate screws.
2 Make the holes in the marked points.
3 Attach the support.
1 Make holes for the attachment screws in the
marked anchoring points.
2 Position the anchoring in the door using the screws
(1).
Use appropriate screws, in line with the
material of the door.
INSTALLATION
55
FENIX Overhead Actuator

Publicidad

Tabla de contenido
loading

Tabla de contenido