Connection To The Multifunction Relay - SMA SUNNY BOY 3.0-US Instrucciones De Instalación

Ocultar thumbs Ver también para SUNNY BOY 3.0-US:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6 Electrical Connection
Reporting the switching status of the grid relay
The multifunction relay can trip a signal to the grid operator as soon as the inverter connects to the
utility grid. To enable this function, the multifunction relays of all inverters must be connected in
parallel.
Figure 13 : Wiring diagram for signaling the switching status of the grid relay (example)
6.5.4

Connection to the Multifunction Relay

Additionally required material (not included in the scope of delivery):
☐ Conduits: 21 mm (0.75 in) or smaller with a proper reducing bush
☐ Rain-tight conduit fittings for wet locations complying with UL 514B: 21 mm (0.75 in) or
smaller with a proper reducing bush
40
SB30-77-1SP-US-40-IA-xx-13
SMA Solar Technology America LLC
Installation Manual

Publicidad

Tabla de contenido
loading

Tabla de contenido