SMA SUNNY TRIPOWER Serie Instrucciones De Instalación página 64

Ocultar thumbs Ver también para SUNNY TRIPOWER Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

13 Procedure for Receiving a Replacement Device
3. If there is a label with "transport lid" affixed to the upper lid of the replacement device, replace
the upper enclosure lid of the replacement device with the upper enclosure lid of the defective
inverter.
Danger to life due to high voltages
Wait 20 minutes before removing the upper enclosure lid to allow residual voltages to discharge.
• Loosen the screws of the upper enclosure lid using an Allen key (AF 4) and remove the
enclosure lid.
• Position the upper enclosure lid with the six screws and conical spring washers on the
enclosure and tighten it using an Allen key (AF 4) in the order 1 to 6 (torque: 6 Nm ±
0.3 Nm).
4. Insert the lower enclosure lid from above and flip it down. Use the enclosure lid of the
defective inverter for this if there is a label with "transport lid" affixed to the enclosure lid of the
replacement device. The screws must protrude from the lower enclosure lid.
5. Tighten all six screws in the lower enclosure lid
with an Allen key (AF 3) in the order 1 to 6
(torque: 2 Nm ± 0.3 Nm). By tightening the
screws in the prescribed order, you avoid
warping the lid, which would keep it from
sealing correctly.
Useful hint: If the screws fall out of the lower
enclosure lid, insert the long screw into the lower
middle hole and the five short screws into the
other holes.
6. Commission the replacement device (see Section 7, page 35). Remount the DC load-break
switch of the defective inverter to the replacement device.
7. Configure the replacement device (see Section 8, page 36).
8. Replace the replacement device in the communication product.
Shipping the Defective Inverter
1. If necessary, position the upper enclosure lid with the six screws and conical spring washers
on the enclosure and tighten it using an Allen key (AF 4) in the order 1 to 6 (torque: 6 Nm ±
0.3 Nm).
2. Insert the lower enclosure lid from above and flip it down. The screws must protrude from the
lower enclosure lid.
64
STPTL-US-10-IA-xx-17
SMA Solar Technology America LLC
Installation Manual

Publicidad

Tabla de contenido
loading

Tabla de contenido