Putting Into Operation - Abicor Binzel FES-200 Instructivo De Servicio

Ocultar thumbs Ver también para FES-200:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

FES-200

6 Putting into operation

DANGER
Risk of injury due to unexpected start
The following instructions must be adhered to during all maintenance, servicing, assembly, disassembly and repair work:
• Switch off the power source.
• Disconnect all electrical connections.
4
1
Fume extraction system FES-200
2
Extraction hose (cable assembly)
Fig. 4
Putting into operation
1 Connect the torch system (4), hose and rubber connector to the fume extraction system.
NOTICE
• When fastening the start-stop replace pliers (3) with clamp, make sure that the red dot points in the direction of the
torch system.
2 Connect the start-stop pliers (3) to the fume extraction system (1) and fasten it to the extraction hose (2) (cable assembly)
of the torch system (4). (Option)
3 Connect the dedusting system to the compressed air.
4 Plug in mains plug.
BAL.0209.0 • 2019-08-06
3
Start-stop pliers, 4 pole (deviating figure possible)
6 Putting into operation
1
2
3
4
Torch system
EN - 15

Publicidad

Tabla de contenido
loading

Tabla de contenido