Cleaning Station Sub-Assembly En; Putting Into Operation - Abicor Binzel BRS-CCi Instructivo De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6 Putting into operation

5.1 Cleaning station sub-assembly
Mount of TCP sensor
1
2
TCP sensor (not included in the
scope of delivery)
3
S1 Inductive proximity switch
(motor down)
Cleaning station sub-assembly
Fig. 3
6 Putting into operation
Risk of injury due to unexpected start-up.
For the entire duration of maintenance, servicing, dismounting and repair work, the following instructions
must be adhered to:
• Switch off the power supply and cut off the compressed air supply.
• Cut off the gas supply.
• Pull the mains plug.
NOTE
• The cleaning station may only be put into operation by trained personnel.
EN - 8
1
2
10
9
8
7
Y1 5/2-directional valve for
4
milling cutter stroke
(bottom - top)
5
Y2 5/2-directional valve for
clamping device (clamp out -
clamp in) and motor (on - off)
DANGER
3
4
5
6
Y3 / Y4 5/3-directional valve
6
for wire cutting device (DAV)/
spraying
7
Injection unit
Clamp for strain relief
8
BRS-CCi
Cable of TCP sensor (not
9
included in the scope of
delivery)
10 Wire cutting device (DAV)

Publicidad

Tabla de contenido
loading

Tabla de contenido