Xylem Lowara TP1 Manual De Montaje página 9

Ocultar thumbs Ver también para Lowara TP1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 19
TP1 condensate pump installation and operating instructions
GB
10 Operating lamps / Overview of faults / Warranty
Work on electrical parts of the TP1 condensate pump may only be performed by qualified staff!
!
Ready for operation
= Steady green light;
Fault
= Red light;
Pump running
= Flashing green light
The alarm output is opened when a fault occurs.
Operating lamp
Green
Red
Off
Off
Flashing
Flashing
On
Flashing
On
On
Off
Flashing
Condensate from condensing systems is aggressive. Avoid contact with residual condensate in the
!
tank, in the condensate supply hose or in the pressure hose! Malfunctioning condensate pumps can be
returned to the manufacturer's address. The manufacturer will refuse to accept packages with unpaid shipping
or invoices for repair.
The manufacturer guarantees the TP1 condensate pump for two years subject to correct installation and
proper use of the device.
11 Disposal
This product and parts thereof must be disposed of in an environmentally friendly way. Corresponding local
regulations must be observed.
12 CE conformity declaration
The TP1 condensate pump complies with the following European standards:
EN 60 335-1 + EN 60 335-2-51 (Safety of electrical systems)
EN 55 014-1 + EN 55 014-2 (Electromagnetic compatibility)
13 Exploded view
1
Condensate inlet (ø 24 mm)
2
Additional inlet opening
(ø 24 mm) with plug
3
Magnet float
4
Mounting bracket
(for rear wall or left side wall)
5
Clip
6
Mains cable (2.0 m) with shock-proof plug
7
Alarm connection cable (floating, 2 m)
8
Non-contact electronic
fill level detection with echo sensors
www.lowara.de
Cause
Mains plug not plugged in
Power failure
Dry-run
(Poss. air in pump)
Pump blocked
Level exceeds alarm level
Pump blocked and
Alarm level exceeded
Solution
Insert plug
Check mains and fuse;
Pump restarts automatically
after one minute;
Visual inspection of the pump
inlet in the tank and removal or
rinsing of dirt or foreign bodies;
Pressure hose / non-return valve blocked
(clean or remove kink if applicable);
Visual inspection of the pump inlet
in the tank and removal or rinsing of dirt
or foreign bodies;
9
Connection for pressure hose (14x2 mm, 6 m)
10 Non-return valve with bayonet Connection
11 Opening for non-return valve
12 Pressure nozzle
13 Tank (0.7 l; usable volume 0.5 l)
14 Permanent magnetic rotor / impeller
15 Pump sump
16 Operating LEDs
17 Stator of the high-efficiency spherical motor
pump
9

Publicidad

Tabla de contenido
loading

Tabla de contenido