Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

6.9. DEMOUNTING

Only press the lift pedals during the wheel loading/unloading phases.
Never press them during other work phases!
1 - Press the button
tool "1" to the position shown in Fig. 37.
2 - Operate the lever
able tool completely under the bead (Fig. 37A).
To obtain a more precise position, press the
button located on the top part of the lever
during movement.
3- Hold down the button
37B).
Rotate the wheel applying pressure on the pedal
.
If necessary, operate the control to lower the head
further
4 - After hooking the bead, release the button to return
the tool to the rest position (Fig. 37C).
5 -
raise the movable tool so that the horizontal
line of the tool is not completely visible (Fig. 37D) - (A,
Fig. 37E).
6 - Ensure that the bottom part of the tyre is completely
broken, otherwise repeat the bottom bead breaking
operation.
134
ATTENZIONE
to move the mobile
to insert the mov-
to hook the bead (Fig.
.
1
Artiglio Master J Operator manual
37
37A
37B

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

4-118263d

Tabla de contenido