Checks Prior To Operation; Installing The Carrying Handles - GENERGY SILENT Serie Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

START UP KEY
C.C BREAKER
AC 16AH BREAKER
OUTPUT AC 230V
REMOTE CONTROL LAMP
RESET
STOP BUTTOM
START UP BUTTOM
LIGHT OF CONTROLLER

4. Checks prior to operation

4.1 Installing the carrying handles

Fix the carrying handles on both sides of generator as shown on the figure below.
The bodywork of the generator is provided with threaded holes for this purpose
and you will find the 8 screws needed provided with the equipment.
GUARDIAN S6-RC
GENERAL BREAKER
57
DISPLAY 4 IN 1
OUTPUT AC 23AH
GROUNDING
ANTENNA
RESTART RECEIVER

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido