Location; Free Room; Installation - Daikin Zanotti SB 120-O Manual De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

6.3

Location

To obtain optimal operation of the unit act as follows:
Note: SB units are equipped with automatic evaporation of defrost water; drain is just a precaution in case
of troubles.
6.4

Free room

When installing the unit leave enough free room to allow opening, correct use and easy maintenance in safe
conditions.
6.5

Installation

A) Prepare a opening with suitable dimensions in the cold room wall (see pictures above).
B) Fix the unit using the screws supplied.
A) Place the unit in a well ventilated room, far from heat sources.
B) Limit the number of door openings.
C) Make sure that the unit has good air supply and discharge.
D) Fit a drain line to the defrost water drain connection in the lower part of the unit.
Solution 1
Position the unit onto the cold room wall inserting the evaporator section in the opening.
Inject silicone on the whole
conveyor perimeter
Solut
ion 2
e drain
Condensat
line D. 10
22

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido