Preparing The Icemaker For Long Storage - Hoshizaki FM-600AHE Manual De Instrucciones

Maquina de cubitos modular
Ocultar thumbs Ver también para FM-600AHE:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 26
3. All parts are factory-adjusted. Improper
adjustments may result in failure.
4. If the unit is turned off, wait for at least 3
minutes before restarting the icemaker to
prevent damage to the Compressor.
1. START UP
The installer will normally commission the icemaker
to start the automatic icemaking process. To
ensure continuous operation, make sure that:
* The water supply tap is on, and
* The icemaker is connected to the power supply.
To start the icemaking process, check the position
of the Operation Switch on the Operation Panel:
"OFF" position - Move it to the "ON" position.
"ON" position - Press the Ice Button.
Ice Button
Display
ICE
DRAIN
STOP
MODE
ICE STOP RESET
Once STOP Button is pushed,
ICE Button cannot start ice
production for 20 min.
Operation Panel
Fig. 1
2. SHUT DOWN
Push the Stop Button on the Operation Panel.
The Display will blink in the "STOP" mode for 5
minutes during the drain control operation and will
start to illumintate constantly at the end of drain
control.
3. PREPARING THE ICEMAKER FOR LONG
STORAGE
) Follow the instructions in "2. SHUT DOWN".
2) Close the water supply tap.
3) Remove the Inlet Hose from the water tap, and
drain the Hose.
Stop Button
Reset Button
Operation Switch
3
4) Disconnect the power supply.
5) Remove all ice from the Storage Bin, and clean
the Bin.
III. MAINTENANCE
1. CLEANING
WARNING
. B e f o r e c a r r y i n g o u t a n y c l e a n i n g o r
maintenance operations, disconnect
the icemaker from the electrical supply
network.
2. Ask a trained service person to check and
clean the Condenser at least once a year.
3. This appliance must not be cleaned by use
of a water jet.
[1] Machine and Bin Exterior
Wipe the exterior at least once per week with a
clean, soft cloth. Use a damp cloth containing a
neutral cleaner to wipe off grease or dirt.
[2] Scoop Cleaning/Sanitisation (Daily)
) Either mix  litre of water with 4 ml of 5.25%
sodium hypochlorite solution in a suitable
container, or the recommended Hoshizaki
sanitiser as directed.
2) Soak the Scoop in the solution for more than 3
minutes. Rinse thoroughly, and shake to remove
surplus liquid.
Note: Using a cloth to dry may re-contaminate.
[3] Storage Bin Interior Cleaning/Sanitisation
(Weekly)
) Open the Storage Bin Door, and remove all ice.
2) Remove the Thumbscrews securing the Baffle.
3) Remove the Baffle from the Bin.
4) Wash the Bin liner and Baffle with a neutral non-
abrasive cleaner. Rinse thoroughly.
ENGLISH

Publicidad

Tabla de contenido
loading

Tabla de contenido