Requirements To Be Met Before Installation - Honeywell SM-RI-X Manual De Instrucciones

Contadores de gas de turbina y cuantómetros
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 103
Honeywell

3.4 Requirements to be met before installation

 Remove sealing caps and foils.
 Check the meter and accessories for signs of transport damage.
 Check that the turbine moves easily by generating a gentle air current.
 Ensure that you have all the tools you require available.
 Check that all the accessories are present (e.g. plug connectors, oil for
initial filling).
 Seals which are suitable for your operating medium (see Table 3 for
examples). Please also check whether you must comply with other
standards, e.g. DIN EN 1591, Parts 1 – 4.
Table 3 | Suitable seals and gaskets
Smallest internal diameter of the seal as per Table 3. The seal must be
installed concentrically with the flange and must not project into the flow.
20
DN
d1 [mm]
50
60
80
90
100
120
150
170
200
225
250
260
300
310
400
390
500
480
600
570
73024521a
© Elster GmbH | All rights reserved. Subject to modification
The following seals and
gaskets, among others, are
suitable:
- flat seals
- spiral-wound gaskets
- grooved seals and gaskets

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Q75

Tabla de contenido