Disposal Of The Riveting Tool - FAR KJ 45/S Instrucciones De Uso

Ocultar thumbs Ver también para KJ 45/S:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 36
KJ 45/S
KJ 45/S
TOPPING UP THE OIL-DYNAMIC CIRCUIT (fi g. f17-f18)
The oil-dynamic circuit should be topped up after a long period of
work or when there is a power loss of the riveting tool. Put the riveting
tool (not fed) in a vertical position rotating the knob (M) towards the
sign "+" up to the end of stroke, and remove the plug (I) by means of
a 4 mm Allen wrench (equipped). During this operation check the oil
level in order to avoid any overfl owing. Then pour the oil VISCOSITY
32° into the oil container (T) (equipped) which shall be screwed to its
seat on the plug (I).
While keeping the riveting tool in vertical position and starting air feeding,
push the button (D) and make the riveting tool carry out some cycles
until air bubbles inside the container stop coming out. This condition
indicates that the topping up of the oil has been fully achieved. At
this point stop the air feeding and while keeping the riveting tool in a
vertical position, unscrew and close the oil container (T) and the plug
(I) checking the soundness of the hermetic washer and repeat all the
adjustments for placing the insert as indicated at page 14-15.
ATTENTION: It is very important to follow the above-mentioned
instructions and use gloves during oil topping up.
If you need to empty completely the hydraulic circuit, you must put
the oil in a suitable container and contact a company authorized to
dispose of wastes.
ATTENTION!
Before disconnecting the compressed air hose,
make sure that it is not under pressure!
ATTENTION: Make sure that the oil fi ller cap (I) is
tightened at a torque corresponding to Min. 5 Nm
÷ Max. 8 Nm.
Revision - 00
GB
MAINTENANCE
Daily maintenance
- Check that the threaded tie rod is not damaged.
- Check the supply system of the compressed air.
- Check that the stroke of the tool is suitable for the selected insert
to clamp (see the pertaining instructions for adjusting the stroke,
indicated at page 14).
- Check that there are neither air nor oil leakages. In this case replace
possible damaged connectors or seals.
- Check that the supply pressure of the compressed air does not
exceed 7 bar.
Weekly maintenance
- Check the oil level controlling the stroke of the riveting tool. If
necessary fi ll up for preventing failures of the riveting tool as
indicated (fi g. f18).
Overhaul of the riveting tool
It is advisable to carry out a complete overhaul of the riveting tool
after 600,000 cycles or every year.
In this case apply only to centres authorized by FAR S.r.l.

DISPOSAL OF THE RIVETING TOOL

Follow the prescriptions of the national laws for disposing
of the riveting tool.
After disconnecting the tool from the pneumatic system,
disassemble and split all the components according to
the material: steel, aluminium, plastic material, etc.
Then proceed to scrap the materials in accordance with
current laws.
f17
Date 11-2008
f18
19

Publicidad

Tabla de contenido
loading

Tabla de contenido