Electric Installation - Franklin Electric 262 Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 51
Required parts and tools
PT 100 Kit 304/316: (308 016 40 . )
904L: (308 016 42 . )
Filling – Kit: (308 726 103)
Filling liquid (5L FES92): 308 353 941
Pressure compensation (Fig.1)
Stand the motor vertically and remove the plug (21) from
valve (2). Remove the plunger from the syringe (4) and carefully push
remove the syringe from the valve and reassemble it.
PT100 assembly (Fig.2 / Fig.3)
Remove the plug (22) from the end bell. Put the jam nut (12), washer
(13)and seal (14) on the PT 100 (11) see Fig.2. Tighten the jam nut
Topping up
Filling (Fig. 1):
lower than the target value:
6" / 8 Motors - 44mm ±2mm
6" Streamline Motors - 59mm ±2mm
10" Motors - 64mm ±2mm
12" Motors -
Venting (Fig. 4):
(2) is located at the highest position. Carefully push the test pin (1)
Checking (Fig. 5): 6"/8"/10" - Feed the test pin (1) through the ope-
ning in the diaphragm cover (3) (8"/10" de-central cover opening) until
resistance is felt. Measure the actual diaphragm distance to the side
of the opening in the diaphragm cover. Adjust the diaphragm position
target value is reached. Fit the plug (21) or the PT100 again.
threaded hole end . Fit the plug (22) or the PT100 again.

Electric installation:

Adjusting switching equipment
PVC
Winding insulation
PE2/PA
Winding insulation
Wear saftey goggles and gloves
Do not pull on the PT 100
55°C
75°C
CONNECTION DIAGRAM
(Fig.1)
(Fig.2)
-
(Fig.3)
11
12
3.1).
13
14
22
(2).
(Fig.4)
on the
(Fig.5)
SW
BLK
GR
GRE
PT100
C
4
2
21
304 / 316ss Version
50mm
904L Version
80mm
(3.1)
2
1
21
Levelgauge
3
1

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

263 serie264 serie265 serie266 serie

Tabla de contenido