Changes To The Design / Construction; Changing The Assembly Location - Nussbaum POWER LIFT HF 3000 Instrucciones De Servicio

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

2.3

Changes to the design / construction

Inspections by a technical expert are required before recommissioning (date, type of change, technical
expert signature).
______________________________________________________________________________________________________
______________________________________________________________________________________________________
Name, address of technical expert
_________________________________________________
Location, date
2.4

Changing the assembly location

Inspections by a technical expert are required before recommissioning (date, type of change, specialist
signature).
______________________________________________________________________________________________________
______________________________________________________________________________________________________
Name, address of technical expert
_________________________________________________
Location, date
66
_________________________________________________
Technical expert signature
_________________________________________________
Signature of Technical Expert of Safety inspections
OPI-POWER LIFT HF 3000-4000-HYMAX HF 3000-4000-V1.3-DE-EN-FR-ES-IT

Publicidad

Tabla de contenido
loading

Tabla de contenido